Minimize material waste, maximize on-site productivity

A new method of design

Juno has developed a proprietary building system—one that uses repeatable components that can be easily configured or adapted to suit a specific site or local codes. This simple-to-use yet sophisticated system helps expedite layout and planning, accelerates build schedules, and makes material sourcing more predictable.
Our component based approach maximizes flexibility.
Our component based approach maximizes flexibility.

Powering industrialized construction

We design using a set of repeatable components that can be efficiently manufactured off-site. Our approach minimizes material waste and accelerates on-site assembly.
A network of suppliers with a single mission
Mass timber
The structural framework of our buildings is made from renewable resources instead of concrete or steel.
Mass Timber Mass timber Arrow iconArrow icon
Bathroom Units
A single, fully finished component can be easily installed on site.
Windows and Curtain Walls
Windows and Curtain Walls
Arrow icon
Arrow icon
Windows and Curtain Walls
Prebuilt components make up the exterior envelope and maximize energy efficiency (and the views).
Millwork
Millwork
Arrow iconArrow icon
Millwork
The interior storage and cabinetry are hardily built to withstand wear and tear and effortlessly snapped into place.
Bathroom Units
Bathroom Units
Arrow iconArrow icon
Interior Walls
The partitions that separate living spaces boast a high fire resistance rating and provide an optimized acoustic barrier.
Interior Walls
Interior Walls
Arrow iconArrow icon
Arrow iconArrow icon
Arrow iconArrow icon

A more intelligent way of building

We’ve developed a proprietary software system that consolidates disparate workflows into a single, streamlined building process.
Coordination of Manufacturers
Coordination of Manufacturers
Facilitation of the production process so independent factories build compatible components.
Sequencing and Scheduling
Sequencing and Scheduling
Synchronization of construction timelines and choreographing of on-site subcontractors.
Future forecasting
Future forecasting
Continuous learning and improvement to make each successive project more efficient.

Fewer personnel, faster production

Off-site production and development transforms complex construction into simple assembly. This allows us to keep manpower to a minimum while accelerating the pace of our projects. See how quickly our Austin property came together.